pisces #120 'cockle' construction photos

Based on hull material and various options chosen, it takes anywhere between 1,000 and 2,000 hours of skilled labor to complete construction of a Pisces 21. We can't include every detail but will try to will post construction photos weekly to keep you updated on her progress. Scheduled completion date is Summer 2010

 

 

Heading for many wonderful adventures. Fair winds from all of us at Classic Boat Shop!

 

 

Final rigging detail

Maiden voyage

Floating off the trailer

Everyone stopped by to look at 'Cockle'!

Detail of sheer strake and coaming

Proud owners take delivery

Cuddy cabin detail showing electronic panel and GPS/Chartplotter on swing out bracket

The perfect day for a launching!

Final detailing before loading

Aft lazarette

Cuddy and electronics detail

Deck hardware installation is completed

Cockle comes to life!

Engine box cover

Deck hardware installation has begun!

Detail of bow

Jean installing mainsheet traveler

Boot stripe and bottom painted

Side decks primed

Foredeck with primer

Varnish coats slowly build up

Transom varnish nearly complete

The boat is protected as we slowly build up coats of varnish

Cockpit trim varnish in progress

Blue plastic and tape protect all finished areas of the deck

Sheer strake is shaped and in place

Decks, coamings and cabin sides taking shape

 

Stephen hand shapes sheer strake

Engine box and prelim engine installation

Cockpit seats and coamings

Teak transom installed

 

Cabin and decks begin to take shape

Bare hull with keel installed

Roughing in initial bulkheads